Repair Work of Drungali Nala Bridge Underway

138

ADC Poonch reaches the site to assess situation

POONCH: A part of Drungali Nala Bridge was damaged due to overnight heavy rains.

 To access the situation, the Additional Deputy Commissioner Poonch, Tahir Mustafa Malik and the OC (GREF), M.K Sharma immediately reached the site and after assessment, the repair work on the damaged portion of the bridge was started.

ADC said that every effort will be made to complete the repair work before the upcoming Chhadi Yatra festival.

ADC has appealed to the people to avoid vehicular/ pedestrian  movement through bridge till the bridge is repaired. He urged people to use the adjacent Bandichechian bridge for the movement.